Military Capabilities

Imagery shows progress of Chinese land building across Spratlys

15 February 2015
Airbus Defence and Space satellite imagery from 30 March and 7 August 2014 and 30 January 2015 shows the extent of Chinese progress in building an island at Gaven Reefs in the Spratly Islands. By 30 January a pre-existing platform had been joined to the new island and at least one helipad built. Credit: CNES 2014/Distribution Airbus DS/IHS

Key Points

  • Satellite imagery shows the construction by China of a new facility on Hughes Reef in the Spratly Islands
  • The site, which has expanded from a 380 sq m platform to an island 75,000 sq m large, is another example of Chinese land reclamation in the Union Banks

Satellite imagery analysed by IHS Jane's has for the first time identified Chinese land reclamation activity and installation construction at Hughes Reef in the Spratly Islands.

The imagery, provided by Airbus Defence and Space and taken in January, also shows the progress of construction at Johnson South Reef, which like Hughes Reef is in the Union Banks, and Gaven Reefs in the Tizard Banks.

IHS Jane's previously used AIS transponder signals to monitor the movements of the Chinese dredger Tian Jing Hao through the Union Banks and Tizard Banks regions in late 2013 and early 2014. It was present at Hughes Reef between 20 March and 3 April 2014.

Hughes Reef

DigitalGlobe imagery captured on 1 February 2004 shows Hughes Reef before construction began, with a 380 m 2concrete platform present. Satellite imagery captured on 14 August 2014 shows land reclamation under way at the reef, which is on the northeast end of the Union Banks. Imagery captured on 24 January 2015 shows 75,000 m 2 of reclaimed land and the construction of a large facility in progress.

The original 380 m 2 installation remains, surrounded by reclaimed land in a manner consistent with other Chinese reclamation projects in the South China Sea. A new, larger installation is under construction directly adjacent to the new platform, while since August 2014 the seawall on the west section has been completed, as has a pier on the new island's eastern side.

Johnson South Reef, Gaven Reefs

Significant progress has also been made at Johnson South Reef, which is about 30 km southwest of Hughes Reef and also part of the Union Banks, and at Gaven Reefs in the Tizard Banks, which are northwest of the Union Banks.

The imagery of Johnson South Reef was captured on 24 January 2015 and shows construction of a large facility under way. Like the building on Hughes Reef, this is directly adjacent to the original structure on the reef.

Construction at Gaven Reefs began some time after 30 March 2014, with imagery dated 7 August showing the construction of an artificial island. Imagery dated 30 January 2015 shows a causeway has linked the island to the original facility and the construction of a helipad.

The buildings on Hughes Reef and Gaven Reefs have almost identical footprints: that of a main square building with what appears to be an anti-aircraft tower or radome at each corner. This suggests that China has standardised the design of key facilities and is rolling it out across its new islands.

Date

Activity noted

1 February 2004Hughes Reef observed; minor facility present
17 December 2013Dredger Tian Jing Hao located on-station at Johnson South Reef via AIS tracking
26 February 2014Land reclamation operations observed at Johnson South Reef
3 March 2014Dredger Tian Jing Hao departed Johnson South Reef
20 March 2014Dredger Tian Jing Hao located on-station at Hughes Reef
31 March 2014Gaven Reefs observed, no activity noted
3 April 2014Dredger Tian Jing Hao departed Hughes Reef
24 May 2014Dredger Tian Jing Hao located on-station at Gaven Reefs
15 June 2014Dredger Tian Jing Hao departed Gaven Reefs
7 August 2014Land reclamation operations observed at Gaven Reefs
8 August 2014Land reclamation operations observed at Fiery Cross Reef
14 August 2014Land reclamation operations observed at Hughes Reef and Johnson South Reef
5 November 2014Land reclamation operations observed at Johnson South Reef
13 November 2014Land reclamation operations observed at Gaven Reefs
14 November 2014Land reclamation operations observed at Fiery Cross Reef
8 January 2015Land reclamation operations observed at Fiery Cross Reef
24 January 2015Land reclamation operations observed at Hughes Reef and Johnson South Reef
30 January 2015Land reclamation operations observed at Gaven Reefs

Want to read more? For analysis on this article and access to all our insight content, please enquire about our subscription options ihs.com/contact



(697 of 1018 words)
By posting a comment you confirm that you have read and accept our Posting Rules and our Terms of Use of this site.
0 comments
Livefyre

RELEVANT PROFILE LISTINGS

  • Indonesian Railways (Persero)

    PT Kereta Api Jalan Perintis Kemerdekaan, 1, Bandung 40117, Java Tel: (+62 22) 423 00 31 Fax: (+62 22) 420 33 42 e-mail: kontak_pelanggan@kereta-api.co.id Web: www.kereta-api.co.id Key personnel Gauge (mm) Route length (km) Electrification (route-km) Voltage Hz AC/DC 1,067 8,159 N/A N/A N/A

  • Philippine Army mortars

    Development Although reportedly produced at one time these mortars are no longer in service or manufactured. Description The Philippine Army is equipped with two mortars of local design and manufacture. The M75 60 mm uses a tripod and a thick-gauge circular, stamped and welded baseplate. It is

  • M29 and M29A1 81 mm mortar

    Development This 81 mm mortar was introduced in 1952 as a replacement for the Brandt-copy M1. It was originally given the service designation M29 and a development designation of T106. The baseplate M3 was developed by the Canadian Armaments Research and Development Establishment (now DRDC

  • OFB E1 120 mm mortar

    Development The Ordnance Factory Board (OFB), formerly Indian Ordnance Factories (IOF), 120 mm E1 mortar was designed to provide heavy and sustained firepower in all phases of battle in various types of terrain. It can provide support to amphibious forces immediately upon landing and can be

  • FN Manufacturing M249 5.56 mm Squad Automatic Weapon (SAW)

    Development The 5.56 mm M249 Squad Automatic Weapon (SAW) was type-classified in 1982. Original plans called for 49,979 for the US Army and 9,974 for the US Marine Corps, but these totals were revised downwards during 1985, pending a number of necessary modifications. This led to the hurried

No comments:

Post a Comment